Now the smell is fresh paint, wood flooring, ceramic adhesive and bathtub caulk.
The indoor projects are complete - until I can think up another one. The young Mr. Rellim has hardwood laminate flooring and new paint. The hallway has ZERO fingerprints. The bathroom has a new tub/shower fixture and ceramic tile. And the hall closet adjacent to the bath/shower no longer has THAT smell (of leaking water and rotting drywall).
Tonight we dug a trench along the west side of the house to place a french drainage system. I'll post pictures soon.
No comments:
Post a Comment